91裸聊视频

Skip to content

Kelowna91裸聊视频檚 Parkinson Recreation Centre boiler replacement to cost $600K

The pool and aquatic area will be closed approximately eight weeks
web1_171101-kcn-prc
Kelowna91裸聊视频檚 Parkinson Recreation Centre. (Photo/City of Kelowna)

Replacement boilers for the Parkinson Recreation Centre (PRC) will cost the city approximately $600,000.

Just days after more than 4,000 Kelowna residents voted against borrowing $241.3 million to replace the PRC, a boiler failure forced the closure of the pool and aquatic area for approximately eight weeks starting Oct. 23.

READ MORE: Pool at Kelowna91裸聊视频檚 Parkinson Recreation Centre to close for up to 8 weeks

The money will replace mechanical and associated pool equipment, with the funds coming from the building

repair reserve.

91裸聊视频淎 condition assessment of Parkinson Recreation Centre was completed in March which identified many of the mechanical systems have exceeded their service lives,91裸聊视频 stated a a staff report.

Several of the boilers that heat the building and small pool are no longer able to operate safely.

The remaining boilers are also past the end of life and a full boiler replacement is being planned.

New boilers will be able to be repurposed when the PRC is permanently closed.

The pool is expected to be reopened in Jan. 2024.

READ MORE: Kelowna council to look at changes to short-term rentals



Gary Barnes

About the Author: Gary Barnes

Journalist and broadcaster for three decades.
Read more



(or

91裸聊视频

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }